Elarys

Rs.13,990

Pay in 3 Installments of

Rs.

5362

Type
Color
Quantity
Camira Gift Box

Rs.900

Floraison Gift Box

Rs.900

Amoria Gift Box

Rs.900

Cash on Delivery Payment method is not available for International Customers.

OUTFIT DESCRIPTION

Designed for a richer winter expression, Elarys presents an unstitched velvet shirt adorned with intricate silver-toned embroidery along the neckline, front panels, sleeves, and hem, elevated by delicate scattered motifs for added depth. A matching velvet dupatta with coordinated embroidered borders enhances the ensemble’s luxurious flow. Paired with raw silk trousers, Elarys blends opulent texture with meticulous craftsmanship — a timeless standout of the Velmor collection.

 

PRODUCT DETAIL

UN-STITCHED & RTW - 3PC

SKU :  UNS-VLMR25-08

SHIRT:
Embroidered Shirt Front Center Left Side Panel (Velvet) 01 piece
Embroidered Shirt Front Center Right Side Panel (Velvet) 01 piece
Embroidered Shirt Front Right Panel (Velvet) 01 piece
Embroidered Shirt Front Left Panel (Velvet) 01 piece
Plain Shirt Back (Velvet) 1.15 meters
Embroidered Sleeves (Velvet) 0.65 meters
Embroidered Front Hem Border (Velvet) 01 meter
Embroidered Back Hem Border (Velvet) 01 meter

Dupatta:
Embroidered Dupatta (Velvet) 2.50 meters

TROUSER:
Dyed Trouser (Raw Silk) 05 meters

 

Color :   Deep Teal

Weight : 1.25 KG (Approximately)

Note:  Stitched Orders require 100 % payment in Advance.

DISCLAIMER
The actual color may slightly vary from the images shown on website. For details please review the disclaimer section.

 

Embellisment and Accessories used during Shoot for Styling Purpose. May Vary in Stitching Orders as per Availability.

DELIVERY DETAIL

For Unstitched Orders

Delivery Time (Pakistan): 5 to 7 Working days after confirmation of order after launch

Delivery Time (International): 10 to 12 Working Days after confirmation of order after launch

For Stitched Orders

Delivery Time (Pakistan): 10 to 14 Working days after confirmation of order after launch

Delivery Time (International): 14 to 21 Working Days after confirmation of order after launch

  • Dry clean recommended
  • Do not use any type of bleach or stain removing chemicals
  • Only soak fabric in cold water
  • Wash and soak colored and white fabrics separately
  • Do not over expose damp fabric to strong sunlight
  • Iron at moderate temperature